Inquiry:
1 The
track and spring system are pre-assembled
2 There
are top meter and bottom meter,which ensure the square frame during
installation
3 The
double track clip and hanging bar can move along the track,they can be fixed with ceiling reinforcement freely.
4 The
motor can sit on the rear beam,need't drill ceiling
Contact: Aron Song
Phone: +86 13373587836
Tel: +86 13373587836
Email: [email protected]
Add: No.2308,Chaoyang road,Xuchang city, Henan province,China